
Long Hau LEED Park is a purpose-built ESG-compliant logistics and manufacturing hub, engineered to address three critical pressures facing businesses today: Speed to market – Long-term cost efficiency – ESG compliance from day one.
Operational Value
- Shared smart infrastructure: AGV-integrated freight elevators, ASHRAE-standard fresh air system, and CCTV security – available from move-in, no additional capital investment required.
- Hybrid warehouse: Fully configurable for manufacturing, warehousing, office, or R&D within a single tenancy – maximizing every square meter with zero relocation costs upon expansion.
- Dedicated property management: End-to-end 1:1 support covering legal compliance, technical operations, and facility management – 24/7.
Technical Specifications
Size unit: 1,000 – 2,000 sqm | Floor loading: 1.0 – 4.0 tons/sqm | Clear height: 8.26 m | Freight elevator: 4 tons
30 minutes to Cat Lai Port, Ben Luc – Long Thanh Expressway & Ring Road 3
➜ https://maps.app.goo.gl/f8up1L5P16ipBG5n6
Suitable for: Electronics · Medical devices · Precision engineering · Logistics · R&D
Groundbreaking: Mar 19, 2026 | Completion: Sep 2026 | Handover: Nov 2026
Request the technical brief and schedule a site visit: +84 906 938 599
➜ Learn more: longhau.com.vn/san-pham/long-hau-leed-park